| |
|
| |
 NPTCS as Owners' Rep |
 Rehab/Remodeling/Refurbish |
 Commercial Projects |
| |
Projects open for sub-contractor and vendor bidding
Last updated:
|
Please complete the short Sub-Contractors Questionnaire to be notified when new projects are posted.
1. Download plan pdf pages from this web page by clicking on the titles.
2. Go to planexpress.net. Orders for prints placed by 1 pm arrive by next day delivery.
After 1pm the plans arrive second day.
Each plan page costs approx. $1.00. FedEx is 40% off for our projects.
Please use the id and password indicated with every project description below.
For help during this short and efficient process, call Plan Express at 800.752.6390.
3. The Blue Book also alerts subs with a Bid Key
Number that
can be used at planexpress.net in place of a id
and password.
|
| * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
|
Project: 79th Street Office Building
Location: 634-640 E. 79th Street - Chicago
Renovations to a commercial building.
Projected Start Date: Late August
Bid Due Date: August 13, 2007 at 5PM
|
TRADES NEEDED: |
- Demo
- Drywall
- Electrical
- Finished Carpentry
- Foundation
- HVAC
- Landscape
- Masonry
|
- Painting
- Plumbing
- Roofing
- Rough Carpentry
- Sprinklers Systems & Fire Protection
- Storefront
- Structured Steel / Metal Framing
- Windows , Doors and Hardware
|
Trades vs. needed drawings.
| |
|
| * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
|
Project: AVALON AT POPLAR CREEK
Location: 1900 Windsong Drive, Schaumburg, IL 60194
Renovations to a commercial building.
Projected Start Date: Tentatively Mid February
Bid Due Date:
|
TRADES NEEDED: |
- Concrete floor
- Demolition
- Doors/Frames/Hardware
- Electrical
- Finishes
- Metal and Wood Soffits
|
- Plumbing
- Rough and Finish Carpentry
- Shelving
- Siding
- Steel
- Thermal and Moisture Protection
| |
|
| * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
|
Project: WEISSBOURD CENTER
Location: Evanston, Illinois Accessibility improvements are comprised of elements
to improve accessibility to portions of this existing building.
Projected Start Date: February 2007
Bid Due Date: 1/17/07 at 7pm
|
TRADES NEEDED: |
- architectural metal
- bath accessories
- carpentry
- demo
- drywall
- electrical
- glazing
|
- hardware
- hollow metal frames
- insulation
- plumbing fixture replacement
- signage
- wood doors
- wood railings
| |
|
| * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
|
Project: LITTLE BIG HOUSES
Location: North Chicago Neighborhood. New construction of several Chicago's Northside homes. Approx. 3,000 sq. ft. "Green" and traditional suppliers welcome to bid. NON Union.
Projected Start Date: TBA
Bid Due Date: TBA
|
TRADES NEEDED: |
- Appliances
- Concrete
- Doors
- Drywall/taping
- Electrical
- Finished Carpentry
- Fixtures
- Flooring
- Framing
- Hardware
|
- HVAC
- Kitchen Cabinets
- Light Fixtures
- Masonry
- Paving
- Plumbing
- Roofing
- Rough Carpentry
- Stair railings
- Windows
| |
PDF PLANS CLICK titles below to view and download plans.
To order prints at planexpress.net USERNAME: nptcslittlebig.
PASSWORD: littlebig or use your Bid Key number
if you received notification from the BLUE BOOK
|
|
|
Plans are under revision and will be posted shortly.
- LittleBigHomes.pdf
|
|
|
| * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
|
Project: WINCE CONDOS
A six unit, three story condo building
Location: 6427 S. Kimbark, Chicago, IL (Kenwood)
Projected Start Date: TBA
Bid Due Date: September 1, 2006
|
TRADES NEEDED: |
- bath and kitchen
- Carpentry - finished
- Carpentry - rough
- Ceramic tile
- Communications
- Construction fence
- Doors and frames
- Electrical
|
- Floors - wood
- HVAC
- Insulation
- Light fixtures
- Plumbing
- Painting
- Windows
| |
|
| * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
|
Project: SORN RESIDENCE
Large New additional to vacant home
Location: 4136 North LeClair. Chicago, IL 60641
Projected Start Date: August 1, 2006
Bid Due Date: August 1, 2006
|
TRADES NEEDED: |
- Carpentry - finished
- Carpentry - rough
- Caulking
- Concrete
- Demolition
- Drywall
|
- Electrical
- Excavation
- Fencing
- Finishes
- Floor covering
- Frames
|
- Hardware
- HVAC
- Insulation
- Masonry
- Moisture Protection
- Paint
|
- Plumbing
- Roofing
- Steel
- Vapor Barriers
- Wall covering
- Windows
| |
|
| * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
|
Project: ALSIP COMMERCIAL RENOVATION
Description: Interior buildout of warehouse and offices
Location: 12520 Lombard Lane Alsip, IL 60803
Projected Start Date: Summer, 2006
Bid Due Date: July 11th, 2006
|
TRADES NEEDED: |
- Builders Hardware
- Doors
- Drywall
- Electrical
- Frames
|
- Hardware
- HVAC
- Metal Studs
- Plumbing
| |
|
| * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
|
Project: CENTRAL AVENUE STRIP MALL
Description: Large Liquor Store and smaller retailers
Location: 345 N. Central Avenue and Lake Street
Projected Start Date: Summer, 2006
Bid Due Date: June 19th, 2006
|
TRADES NEEDED: |
- Carpentry - finished
- Carpentry - rough
- Caulking
- Concrete
- Doors
- Drywall
|
- Electrical
- Excavation
- Fencing
- Finishes
- Floor covering
- Frames
|
- Hardware
- HVAC
- Insulation
- Masonry
- Moisture Protection
- Paint
|
- Paving
- Plumbing
- Roofing
- Steel
- Vapor Barriers
- Wall covering
| |
|
| * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
|
Project: CALUMET HOUSE
Description: 4 large condos in large Victorian
Location: 59th and Calumet (just outside of Hyde Park)
Projected Start Date: June 2006
Bid Due Date: June 19, 2006
|
TRADES NEEDED: |
- Carpentry - finished
- Carpentry - rough
- Caulking
- Concrete
- Demolition
- Drywall
|
- Electrical
- Excavation
- Fencing
- Finishes
- Floor covering
- Frames
|
- Hardware
- HVAC
- Insulation
- Masonry
- Moisture Protection
- Paint
|
- Paving
- Plumbing
- Roofing
- Steel
- Vapor Barriers
- Wall covering
| |
|
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
|
Project: HYDE PARK BLDG.
Description: Large addition to two townhomes
Location: Hyde Park Community
Projected Start Date: May 06
Bid Due Date: June 15, 2006 5:00 PM
|
TRADES NEEDED: |
- Windows - Pella Specified
- Roofing
- Masonry
- OH Doors
- Drywall
|
- Concrete
- Excavation
- Exterior Doors
- Steel - structural & architectural
- Precast Concrete
- Carpentry
|
- Insulation
- Painting
- Drywall
- Wood Floors
- Skylights
- Plumbing
| | |
|
| * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
|
Project: 600 N. Michigan, Home Element Store
Description: Buildout for Large furniture store, 13,000 sq. ft.
Location: Mag Mile strip - Downtown Chicago
Project Start Date: Late May 2006
Bid Due Date: June 09, 2006
|
TRADES NEEDED: |
- Demo
- Electrical
- Finish carpentry
- HVAC
- Fire Sprinklers
|
- 20' Security Screen Door
- Painting
- Floor- Paint coating
- Cleaning
- Electrical supplies
- Drywall
| |
|
| * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
|
Project: THE PRAIRIE HOME
Location: Chicago, Illinois - Bronzeville
Projected Start Date: TBA
Bid Due Date: June 20, 2006
|
TRADES NEEDED: |
- Carpentry - finished
- Carpentry - rough
- Caulking
- Concrete
- Demolition
- Drywall
|
- Electrical
- Excavation
- Fencing
- Finishes
- Floor covering
- Frames
|
- Hardware
- HVAC
- Insulation
- Masonry
- Moisture Protection
- Paint
|
- Paving
- Plumbing
- Roofing
- Steel
- Vapor Barriers
- Wall covering
| |
PDF PLANS CLICK titles below to view and download plans.
To order prints at planexpress.net
USERNAME: nptcsprarie.
PASSWORD: prarie or use your Bid Key number
if you received notification from the BLUE BOOK
|
|
|
PLANS ARE BEING REVISED AND WILL BE POSTED SOON
|
|
| * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
|
Project: KEDZIE CAR WASH
Description: New construction of multi-car wash
Location: Ashburn Community, Chicago
Projected Start Date: Late April 2006
Bid Due Date: PROJECT ON HOLD
|
TRADES NEEDED: |
- Carpentry - finished
- Carpentry - rough
- Caulking
- Concrete
- Doors
- Drywall
|
- Electrical
- Excavation
Fencing
- Finishes
- Floor covering
- Frames
|
- Hardware
- HVAC
- Insulation
- Masonry
- Moisture Protection
- Paint
|
- Paving
- Plumbing
- Roofing
- Steel
- Vapor Barriers
- Wall covering
| |
|
| * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
|
Project: UNION STREET HOME DEVELOPEMENT
Description: New home construction with garage
Location: 119th and Union, Chicago, IL
Projected Start Date: Early May, 2006
Bid Due Date: June 15, 2006
The first phase - a single home will be built.
Second phase -
four more single family homes will be built.
Additional phases - will increase the number of homes to one hundred.
Please Note: There are three slightly different floor plans.
|
TRADES NEEDED: |
- Carpentry - finished
- Carpentry - rough
- Caulking
- Concrete
- Doors
- Drywall
|
- Electrical
- Excavation
- Fencing
- Finishes
- Floor covering
- Frames
|
- Hardware
- HVAC
- Insulation
- Masonry
- Moisture Protection
- Paint
|
- Paving
- Plumbing
- Roofing
- Steel
- Vapor Barriers
- Wall covering
| |
|
| * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
|
Project: GOLF GLEN THEATRE DEMO
Description:
Location: Niles, Illinois
Projected Start Date: Tentative
Bid Due Date: June 15, 2006
|
| * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
|
Project: THE EMPORIUM
Description: Restoration of a 3 story commercial gray stone
Location: Bronzeville Neighborhood, Chicago
Projected Start Date: Late March, 2006
Plans are tentatively available Mid February, 2005.
Please check with us again.
Bid Due Date: To Be Announced Soon.
|
TRADES NEEDED: |
- Carpentry - finished
- Carpentry - rough
- Caulking
- Concrete
- Demolition
- Drywall
|
- Electrical
- Excavation
- Fencing
- Finishes
- Floor covering
- Frames
|
- Hardware
- HVAC
- Insulation
- Masonry
- Moisture Protection
- Paint
|
- Paving
- Plumbing
- Roofing
- Steel
- Vapor Barriers
- Wall covering
| |
All subs must carry the required licenses, etc. to conduct business at the project locations.
We would appreciate additional information on your business and have provided a
Sub-Contractors Questionnaire for this purpose to submit back to us.
Thanks in advance for your responses.
|
|
|